Case studies
Projects where the funding held up.
Three water systems, three different funding routes. What the problem was, what we specified, and what the programs actually paid.

Municipal pump station rebuild
Three failing pumps and no usable metering, replaced against a measured baseline with a state revolving fund covering part of the work.
Read more →
Rural disinfection rebuild
A disinfection train at the end of its life, rebuilt with a USDA grant while the system kept producing.
Read more →
District metering and leak detection
A fifth of treated water unaccounted for, turned into a map of where it was going.
Read more →Your system will not look exactly like these.
It rarely does. The useful conversation is about which programs are open to you right now, which takes about fifteen minutes.